我们正在安装来自Fenchurch Street的新型接线系统,沿着Tilbury Loop系列从Fenchurch Street到Hornchurch和Pitsea,以提高乘客的可靠性
The current Mk1 overhead line equipment (OLE) system was installed on this section of the line over 50 years ago. This upgrade will improve the system and bring it in line with 21英石世纪标准。从Fenchurch Street到Hornchurch和Pitsea,沿着Tilbury Loop,将安装165次电线升级OLE系统。还将安装新的基础和结构。
计划的好处
可能发生延误when a problem affects the OLE and they can be complex to resolve, requiring us to either stop or slow down services through the area. These works are a vital part of our strategy to provide a more reliable and efficient railway, putting our passengers first. The upgrade work will deliver:
- 可以适应炎热天气尤其重要的天气条件的系统,这意味着较少的延迟和取消
- A modern infrastructure system in line with 21英石century standards
- 一种更可靠和可持续的系统,需要更少的维护,意味着减少成本和中断
- Reduced likelihood of equipment failures and power outages
这些改进将使越来越多的乘客使用该线来延期。
When are we going to deliver this work?
工作预计将于2020年秋季安装,这也被称为打桩。桩工作导致额外的噪音,我们将尽一切可能降低噪音并在工作开始前通知当地居民。
Wiring and structure renewal is expected to start in the Pitsea area in May 2021 and will continue along the line until 2024.
Will this work affect train services?
为了让我们安全地在赛道和架空线上工作,在选定的周末和银行假期的服务会有一些中断。我们计划在2021,2022和2023年的圣诞节期间完成更复杂的作品,以尽可能最大限度地减少干扰。
该网页将在未来几个月内提供该计划和铁路更换服务的进一步详情。
联系我们关于我们的续订计划
如果您有兴趣了解更多有关我们的计划替换OLE设备,请通过访问我们的方式与我们联系contact us page或者通过致电我们的24小时全国帮助03457 11 41 41。