Aberdeen到Inverness改进项目,为两个新站点来看。

Aberdeen - 因弗内斯改善项目阶段1是苏格兰政府资助项目,升级8月20日委托的铁路基础设施th2019年。

Over 10 miles of new rail was laid across more than 41,000 sleepers as part of the work, which has also saw signalling upgraded and 19 bridges on the line either refurbished or replaced. This worked allowed for the delivery of enhanced commuter services into each city and provided capacity for the construction of two new stations. Kintore opened October 2020 and Inverness Airport is due to open in 2022.

包含关键阶段1改进

  • The redoubling of the track between Aberdeen and Inverurie
  • Signalling enhancements between Nairn and Elgin
  • Platform extensions at Insch and Elgin
  • Forres Station的搬迁
  • Loop extension of the track at Forres.

Kintore Station

Kintore station -re-opened on Scotland’s Railway after an absence of 56 years.

Funded by Transport Scotland, Aberdeenshire Council and Nestrans, the £15 million station was built by Network Rail and has fully accessible, step-free access between platforms via a footbridge with lifts.

The station, which will be managed by ScotRail, has the largest electric vehicle charging location in the north east of Scotland, with 24 of the 168 spaces at the new transport hub fitted with charging points.

亚搏彩票软件官网网络铁路与Aberdeenshire委员会密切合作,提供交汇处,配有公共汽车链路,自行车存储设施和与A96循环路径的集成。

克林特站鸟瞰图

因弗内斯机场火车站

The Inverness Airport Train Station project is due to commence summer 2021 and finishing December 2022. It will have,

  • 一个不置信的两个平台站(通过升降机的无脚桥访问)与因弗内斯机场相邻
  • 64 carparking spaces including 10 electric charging facilities and 4 disabled spaces and cycle parking.
  • Capability for bus parking facilities
  • 将有等待的避难所,座位,票务机,帮助点和闭路电视。
新的因弗内斯机场景观从南方

联系我们

对于有关项目的任何意见或疑问,请联系我们03457 亚搏彩票软件官网11 41 41的24小时网络轨道国家助理线。

For the latest information, you can follow us on Twitter@NetworkRailA2I

您还可以通过电子邮件提交任何问题或查询aberdeeninverness@networkrail.co.uk.