We’re partnering with Woking Borough Council and Surrey County Council to deliver a new and improved railway bridge in Woking.

维多利亚曲拱在冰时加宽
艺术家的印象 - 仅限指示

The project will replace and widen the Victoria Arch railway bridge in Woking as part of a major scheme to reduce traffic congestion, improve safety for pedestrians and cyclists and unlock additional housing capacity.

By widening the railway bridge, Guildford Road, the main road running through Woking, can be transformed into a dual-carriageway, providing a safer environment and better connectivity for pedestrians and cyclists to access the town centre, railway station, community facilities and neighbouring residential areas.

The scheme forms part of Woking Borough理事会更广泛的战略to unlock development sites for much-needed town centre housing.

预计工作将在春季2021年开始,预计将于2024年初结束。

我们正在做什么

我们正在确定新铁路桥梁的设计,与我们的合作伙伴密切合作,制定一个交付策略,以最大限度地减少乘客中断。早期启用工作已经在进行中,工程师完成调查以帮助设计选择。

线封闭

在拆除和重建维多利亚拱门铁路桥时,将需要临时线关闭。关闭的细节将在这里发布。

联系我们

有关更多信息或与我们取得联系,请通过访问我们的方式与我们联系联系我们页面or by calling our 24-hour national helpline on 03457 11 41 41.