整体satisfaction at our managed stations.

The National Rail Passenger Survey (NRPS) satisfaction rating is based on all aspects of the station’s performance, including provision of train information, connections to other transport links, cleanliness, upkeep and repair of buildings and choice of shops, eating and drinking facilities. The survey is conducted twice a year (Spring and Autumn) by independent watchdogTransport Focus.

% very/fairly satisfied with station satisfaction Spring 2020 % chg year on year
整体 85.9% 0.9%
London Bridge 93.5% 3.1%
Reading 93.4% -0.6%
St Pancras 93.0% -0.3%
Liverpool Lime Street 91.9% -1.3%
Kings Cross 90.8% -1.6%
Glasgow Central 90.0% 2.5%
Manchester Piccadilly 90.0% 4.2%
Birmingham New Street 89.2% -1.8%
Victoria 88.5% 6.4%
Edinburgh 88.5% 2.3%
Paddington 87.2% -1.6%
Cannon Street 85.7% 3.7%
Liverpool Street 85.6% 0.0%
Waterloo 84.9% 1.4%
Bristol Temple Meads 83.0% 2.5%
Leeds 80.3% 5.8%
Charing Cross 78.9% -10.6%
Clapham Junction 72.8% 2.2%
Euston 69.6% -5.4%
Guildford 63.7% -11.5%

我们的管理站点