提供准时和可靠性是我们对乘客的承诺

It’s important to us to get this right, and to be able to account for how we’re doing to our customers, and our regulators.

我们知道CP5的行业表现不够好。2018年11月,铁路和道路(ORR)办公室在网络轨道上临时令,与绩效规划和服务恢复程序的缺陷有关。亚搏彩票软件官网我们的报告是在2019年2月提交了此次订单的。该报告列出了我们对CP5延期惩罚性趋势的因素的评估,概述了我们的行业绩效管理系统的发展,并描述了我们解决所有改进的计划绩效规划和交付领域,以提供可持续的,长期的绩效改进。

Working together with our industry partners, we are committed to delivering the levels of reliability that customers expect and deserve in CP6, while also meeting growing demand.

下载我们的报告and求职信

On Time measures

The On Time measures add to the public performance measure (PPM) used in CP5. In CP6, the rail industry will measure performance using a suite of industry-endorsed measures that are currently the most transparent in Europe.

On Time and cancellation data better reflect the experience of passengers and tell us how trains are operating on the infrastructure we manage.

A description and of the measures and how we are performing against them can be found on our铁路绩效页面

Safety performance

xinyabo体育 is our foremost priority in operating the railway. That’s why we have a强大的指标系列我们用来确保我们正在尽我们所能,以确保乘客的整体安全,劳动力和公众在与铁路系统的设计,建设,维护和运营各方面相关的风险。

查看我们的最新安全性能数字

注意:除非另有说明,否则此页面上的所有数据仅适用于初始指示,并且可能会在后续出版物中进行更改