Before work can begin on electrifying the railway, we need to complete a vast amount of design and preparation work

Installing foundations to support overhead line equipment (OLE), which we call piling, is part of this preparatory work. Once the cylindrical steel piles have been installed, we then begin to erect trackside posts and overhead wires.

打桩涉及将桩深进入地面。这通常在平日和周末在夜间完成。我们意识到打桩可能导致我们的线路邻居的不便,并尽一切努力最小化中断。

在上面的剪辑中,您可以在10,250和500米处被驱动到地面时产生的噪音水平。

For safety reasons, work of this type must be carried out while trains are not running. Under our licence conditions we arecontractually obliged to work at times that cause the least disruption训练服务。

根据地面条件,平均桩在20到60分钟之间,通常在一次时完成。完成后,工作将进入另一个位置。

了解我们的高输出工厂系统(啤酒花)机器,用于在伟大的西式主线安装架空线路设备