This form is for submitting product acceptance requests

Please provide all requested information about the product applicant and manufacturer, and justify the introduction or change by demonstrating whole life cost, safety and / or performance benefits.

You can view the types of items that typically require产品批准, please note that this list is not exhaustive and advice may be required to determine whether your product requires approval.

还请参阅指导文件 - 如何决定需要产品验收有关此过程适用的产品的更多详细信息。

* 笔记:Items required for civils infrastructure do not require approval, please refer to Network Rail standard NR/L2/CIV/003 regarding civils design approval.

应提交对民用涂料的要求cataloguequeries@networkrail.co.uk.以及合适的测试房屋证书。

Please note that all applications need to be submitted by a Network Rail operative (applicant), who is prepared to act in a sponsorship capacity and who can demonstrate a Network Rail business need or someone from within a Plant Acceptance Body (PAB) organisation who has been designated.

申请应是新的或修改的受控产品,其中与网络轨道挑战陈述的相关对齐,这已被评估为轨道行业准备水平(RIRL)在哪里;亚搏彩票软件官网

  • Technology readiness level (TRL) 6 is completed
  • Reliability Readiness Levels (RRL) 7 is completed as outlined in Design For Reliability standard NR/L2/RSE/0005

*Note: Evidence should be submitted to demonstrate that the product or change has met the requirements of the selected RIRL. If RIRL5 has been selected, evidence will need to be submitted to confirm that the Technology (TRL) and Reliability (RRL) requirements of RIRL’s 1 to 4 have been met.

Incomplete applications will not be processed until all relevant information has been submitted.

要求新的或修改目录号码寿ld first be referred tocataloguequeries@networkrail.co.uk.as technical assessment may not be required via Product Acceptance.

For further guidance please email us atprodacc@networkrail.co.uk

required fields

产品信息

(For changes to already approved products)
(对于未经单价的已经批准的产品进行更改,请写n / a)
证据是需要提交给朱元璋e that the requirements of the selected RIRL has been met (e.g. if you believe that this solution has reached RIRL5, evidence should be available that confirms that the TRL and RRL requirements of RIRL’s 1 to 4 have been met). Reliability Readiness Levels (RRL’s) relate to Design For Reliability (DFR) requirements which are specified in NR standard NR/L2/RSE/0005 and apply to the majority of new or change request applications (NB: does not apply to software or projects that commenced prior to April 2017, please email prodacc@networkrail.co.uk for clarification). About Rail Industry Readiness
(For new items select the appropriate challenge statement below that aligns with your solution. If you believe that your solution does not align with any of the categories, provide clarification as to why this is not applicable in the box below.) Find out more information about challenge statements

Applicant Details

Manufacturer details

理由

(List of each geographic location/s where these are to be used or installed)
(List the names of project)
(items should be applied for at least 90 days prior to the date they are required.)
(例如,计划预算或卷。)
(Please outline the whole life cost and the safety and performance benefits that will result from the new / changed product (min 500, max 1000 characters)
请选择安全,技术和工程(STE)资产拥有工程学科

其他细节

例如照片,绘图,数据表。最大总约为7 MB。仅PDF,DOC,DOCX,JPEG和JPG文件。应该将进一步的文档提交给prodacc@networkreail.co.uk,应用产品或系统名称清楚地标记电子邮件。
Confirm that the manufacturer has read and accepts ourgeneral terms and conditions
Confirm that the applicant has read theGuide to product acceptance
确认申请已达到所需的准备水平,并且可用于证明合规性的证据。

Ourprivacy noticeapplies to the personal information that Network Rail collects about you, or that you provide to us. It explains how and why we use your personal information, who we disclose it to and how we protect your privacy.