这Network Rail archive是与今天的铁路基础设施有关的广泛历史文件和计划的托管人。
It represents the development of the most significant structures, engineers and innovation on the railway from the 19th century to the present.
每个月我们都将深入研究档案,以通过年龄亮了我们网络的开发。
1月 - 伦敦收费跨站
今天,伦敦收费十字架是我们20个托管站之一,每年容纳4200万乘客。Opened in January 1864在威斯敏斯特市,它是由John Hawkshaw爵士设计的,他还设计了Cannon Street Station和Severn隧道。E议院议会大厦爵士的儿子爵士,SIR Charles Barry的儿子设计了该车站的酒店。
Charing Cross station was built on the site of the famous Hungerford Market, the site of which was originally owned by克里斯托弗爵士爵士是圣保罗大教堂后面的着名建筑师。亚搏彩票软件官网网络轨道持有由WREN签署的1684年和1717年的Hungerford市场网站的原始标题契约,因为它们构成了我们19的前标题的一部分TH.世纪铁路标题:
你知道吗?Charing Cross Bridge replaced Hungerford Bridge, a suspension footbridge designed by eminent engineer伊马姆德王国布罗伦。在布里斯托尔的Clifton悬架桥上重新使用了行人桥的链条。
这station required substantial repairs following the collapse of its roof in 1905 during work on Hawkshaw’s arched train shed roof. A wrought iron tie rod snapped which caused a significant section of the roof to collapse and a wall to fall onto the adjacent Avenue Theatre. While there was time to clear the scene and suspend train services from the station, six people died in the incident.
所剩不多的拱形屋顶拆卸;as the subsequent inquiry raised questions about the original design and construction, the decision was taken to replace it with a flat ridge and furrow roof in 1906.
This October 1909 drawing shows the new roof over the Continental Platform; Charing Cross had become a terminus for boat journeys to continental Europe:
一般候诊室镶板,1913年1月27日:
在1940年在航空袭击损坏后,收取交叉需要进一步修理:
In the 1980s, the station was redeveloped and the air space above the platforms used for new office accommodation. Designed by Terry Farrell, Embankment Place rests on a concrete raft put in place of the 1906 roof.
该建筑没有突出进入车站的支撑柱,这允许空间保持开放和光感。从河里看,堤防广场给维多利亚时代的火车棚屋顶上升到泰晤士河的岸边。